Community Involvement. Blackheath canal solutions consultation Oct

Community Involvement. Blackheath canal solutions consultation Oct

The most well-liked strategic path option for the avoid at Blackheath was launched for assessment on 12 Oct 2020, concentrating upon an extended tunnel with different portal alternatives. Consultation continuous until 28 November. The wedding included three community records meeting, held using the internet being conform to information from NSW health insurance and Covid-19 restrictions. 241 folk reserved into the on-line assessment classes, while a further 125 someone watched the taped sessions later on. Seven phone services were furthermore conducted, at consult of specific people. More than 6211 group seen the web digital assessment site and most 2486 items of comments comprise was given because of the project group. You will see or download town assessment summary document (PDF, 5.52Mb).

Medlow tub improvement assessment Summer – August 2020

The proper build for your upgrade of the Great Western road through Medlow tub was launched for society consultation on 29 Summer, with assessment continuing to 31 August 2020. The wedding included eight neighborhood information classes, conducted on line being adhere to information from NSW health insurance and Covid-19 limits. The classes were went to by 70 someone. A number of targeted records periods were also conducted with local companies, groups and groups and many cell meetings had been in addition held. Over 850 components of comments are got of the task team.You can see or install the community consultation summary report (PDF, 3.7Mb).

Katoomba to Lithgow strategic design assessment November – December 2019

The strategic layout for any improve for the Great west road from Katoomba to Lithgow was released for area assessment on 07 November 2019, with assessment continuing to 16 December 2019. The engagement provided nine society records meeting, two pop-up showcases and another public conference held over the corridor at areas including Katoomba, Medlow bathtub, Blackheath, Mount Victoria, Hartley and Lithgow. The sessions comprise went to by 1350 individuals and 1759 components of suggestions happened to be got from the venture personnel. You will see or install town consultation overview document (PDF, 18.5Mb).

Blackheath Co-Design Committee

The Blackheath Co-Design Committee (BCC) had been established by Transport for NSW in March 2020, appropriate suggestions from the neighborhood. The panel provided stakeholder team associates, selected community associates, and representatives from Blue hills town Council and disaster treatments.

The BCC had not been a choice generating looks, nevertheless the upshot of the BCC is an important feedback inside Government’s decision making process for determining a desired path choice and concept due to the fact program progresses.

The panel’s unanimously ideal option had been for some time tunnel underneath Blackheath.

Blackheath Co-Design Committee Meeting Minutes

View or get:

Task records

Some paperwork about page cannot follow access needs (WCAG). If you find yourself having problems opening info on these documentation, please e mail us.

Society updates

Venture announcements

Geotechnical research focus on the Great west Highway in Medlow shower.

Investigation work at the best west interstate from Katoomba to Blackheath.

Researching run the truly amazing west road from minimal Hartley to Lithgow.

Media secretes

Big west road improve powering forward

Reliable passage through Medlow shower before full freeway improvement

Archaeological enjoy to understand more about Aboriginal connection to azure Mountains

Australia longest path tunnel proposed for Great Western freeway improvement

Creating the foundation for road improvement

Freeway history as maintained for generations to come

Contracts granted for Great Western freeway update really works

Protection drives highway upgrade rapidloan.net/2000-dollar-payday-loan/ near me at Medlow bathtub

More time for the state on Blackheath tunnel

Tunnel alternatives most useful complement Blackheath

Going west this long sunday? Generating your trip homes quicker and reliable

Agreement awarded for Great Western Highway upgrade through Medlow shower

Medlow shower people have more time and energy to see Great Western interstate concept

Medlow Bath customers asked to have their say on Great west Highway design

Two feasible bypasses of Blackheath regarded as by committee

Big west freeway improvement west of Lithgow

Neighbors posses their state on Great west road update

Blackheath locals to greatly help co-design fantastic west Highway upgrade

Blackheath area asked to meeting to learn more about the truly amazing Western interstate improvement

Get state on Great Western interstate

Green light for $2.5 billion Great american freeway duplication